Upcoming EventsLocationFacility InformationSeating ChartsNewsContact UsMTS IceplexWinnipeg Jets
Thursday, July 29, 2004

Construction Briefing #9


Steel frame for stairway leading from grand lobby down to event level at MTS Centre


More than 13 miles of pvc piping has been installed to create the conduits for the chilled calcium chloride "brine" that lowers the temperature of the concrete ice floor to make ice.


A section of the downtown walkway system along the Hargrave Street side of MTS Centre leading to Cityplace


Seats are installed and ready for patrons to visit in November 2004

Construction and demolition photography provided courtesy of Private Eye Studios (204) 947-1820

www.privateyestudios.ca

Contact Us | Jobs | Photo Archive | Seating Charts | Site Map | Privacy Policy